Structure: Westruper Holz- u. Ing.-Bau Wehmeyer GmbH & Co. KG.
This pedestrian and cyclist bridge is 1.75 metres wide and 15.00 metres long. The entire bridge is constructed of Bongossi timber and was completely prefabricated at the factory and delivered to the site.
Client
Gemeinde Gensingen
Construction period
March 2003 – March 2003