WHB Wehmeyer

Zurück zur Übersicht

Roof construction

Thanks to modern EDP systems, roof structures are now much easier to plan.

Lawn Tennis Club Letchworth Stokesley Managed Workspace

Ice Arena Kufstein

The entire roof structure is supported by 4 fanned out steel supports. Two steel supports hold up one long truss girder made of timber and steel measuring 81 metres resepectively. Laminated timber trusses measuring 28 metres are suspended between the two main girders.


Architect
Malojer Baumanagment GmbH & Co.
Client
City of Kufstein
Engineer
Grossmann Bau for timber building
Construction period
June 2005 – June 2005

prev next