WHB Wehmeyer

Zurück zur Übersicht
Office Building at Fügen Swimming Pool in Mönchengladbach

Oakfield School in Dartford

Timber frame structure: Grossmann Bau GmbH.                 

The support structure for the two monopitch-roofed buildings (12 m x 68 m and 12 m x 39 m) was built entirely of plywood and laminated timber.


Architect
Spacecraft Architects, London
Client
Kent County Council, Kent
Construction period
January 2009 – February 2009